2015-0611 Nonprecedential Affirmed Processed

11 New Zealand Road, LLC v. Town of Seabrook

Supreme Court of New Hampshire · Filed June 24, 2016

The holding in the court’s own words

THE STATE OF NEW HAMPSHIRE SUPREME COURT In Case No. 2015-0611, New Zealand Road, LLC v. Town of Seabrook, the court on June 24, 2016, issued the following order: Having considered the briefs and record submitted on appeal, we conclude that oral argument is unnecessary in this case. We conclude that the record supports the superior court’s decision that a DOT traffic impact and access study was not required. We conclude that the record supports the superior court’s decision that the board had sufficient evidence upon which to reasonably base its decision to approve the intervenor’s site plan.

Quoted verbatim from the opinion — no paraphrase, nothing generated. Not yet human-reviewed. How we find the holding.

Authorities cited

Identified automatically; this list may not be exhaustive.

Opinion text

THE STATE OF NEW HAMPSHIRE

SUPREME COURT

In Case No. 2015-0611, 11 New Zealand Road, LLC v. Town
of Seabrook, the court on June 24, 2016, issued the following
order:

Having considered the briefs and record submitted on appeal, we
conclude that oral argument is unnecessary in this case. See Sup. Ct. R. 18(1).
We affirm.

The petitioner, 11 New Zealand Road, LLC, appeals the order of the
Superior Court (Delker, J.) affirming the decision of the Town of Seabrook
Planning Board (board) to approve the site plan of the intervenor, Tropic Star
Development, LLC, for a gas station and convenience store. The petitioner
argues that: (1) the evidence was insufficient to show that the proposed
development would not adversely impact its adjacent property; (2) approval of a
more intensive use of a non-conforming lot is contrary to the town’s goal of
reducing non-conforming uses; and (3) the record is insufficient to show that
the intervenor correctly estimated the projected traffic flow.

Superior court review of planning board decisions is limited. Ltd.
Editions Properties v. Town of Hebron, 162 N.H. 488, 491 (2011). The superior
court must treat the factual findings of the planning board as prima facie
lawful and reasonable and cannot set aside its decision absent
unreasonableness or an identified error of law. Id. The appealing party bears
the burden of persuading the superior court that, by the balance of
probabilities, the board’s decision was unreasonable. Id. The review by the
superior court is not to determine whether it agrees with the planning board’s
findings, but to determine whether there is evidence upon which they could
have been reasonably based. Id. Our review of the superior court’s decision is
equally deferential. Id. We will uphold the decision on appeal unless it is
unsupported by the evidence or legally erroneous. Id.

The petitioner raises several arguments challenging the sufficiency of the
evidence to show that the proposed development would not adversely impact its
adjacent property. The record shows that the petitioner’s easement over the
intervenor’s property provides the only access to its property. Previously, the
superior court remanded the board’s approval of the intervenor’s site plan,
after concluding that the board had failed “to assess the impact of the internal
traffic flow of the [intervenor’s lot] as it affected the [petitioner’s lot] with its
own traffic flow issues, considering it is zoned for restaurant use.” The record
shows that upon remand, the intervenor made numerous plan revisions
designed to address the petitioner’s concerns, including modifications
recommended by the town’s independent engineer. The intervenor’s
transportation engineer, after considering access to both lots, the circulation of
traffic in the proposed development, the expected number of vehicles accessing
both lots, and other relevant factors, concluded that the development would
not adversely impact the petitioner’s property. The town’s engineer agreed.
The petitioner argues that the board should have required the intervenor to
submit a New Hampshire Department of Transportation (DOT) traffic impact
and access study to analyze the impact of the proposed development on its
adjacent property. As the superior court noted, its remand order did not
require a DOT traffic impact and access study or any other specific type of
study; it required only that the board assess the impact of the proposed
development on the petitioner’s property. In addition, the record shows that
neither the DOT nor the town’s engineer believed that a full DOT traffic impact
and access study was necessary. We conclude that the record supports the
superior court’s decision that a DOT traffic impact and access study was not
required. See id.

The petitioner argues that the intervenor’s June 18, 2014 “traffic
operations analysis” lacked the information necessary to evaluate traffic
circulation and driveway usage. However, as the superior court noted, the
traffic operations analysis constituted only part of the evidence relevant to
traffic circulation and driveway usage. The record also includes an April 11,
2014 report from the intervenor’s transportation engineer and additional
information provided by the engineer at the August 5, 2014 and September 16,
2014 public hearings. Although the petitioner’s engineer disagreed with the
conclusions of the intervenor’s engineer, the superior court’s role is not to
determine whether it agrees with the board’s findings, but to determine
whether there is evidence upon which the findings could have been reasonably
based. Ltd. Editions Properties, 162 N.H. at 491. We conclude that the record
supports the superior court’s decision that the board had sufficient evidence
upon which to reasonably base its decision to approve the intervenor’s site
plan. See id.

The petitioner next argues that the superior court erred in affirming the
board’s decision to approve a more intensive use of a non-conforming lot. The
petitioner does not argue that the intervenor’s development plan constitutes an
impermissible expansion of a non-conforming use; rather, it asserts that
eliminating nonconformities is a “legitimate municipal goal” reflected in the
town’s site plan review regulations, and that the board’s observation that large
truck access under the proposed development will be no less adequate than
under the previous configuration is inconsistent with that goal.

As the court noted in its order, the proposed development includes
features designed to improve truck access, including wider driveways and a
design that improves truck maneuverability, so that the more intensive use of

2
the lot will not result in impaired access. We agree with the superior court that
it was reasonable for the board to compare truck access under the proposed
configuration with access under the prior configuration. See id.

Finally, the petitioner argues that the intervenor erred in estimating
projected traffic flow by using Institute of Transportation Engineers Land Use
Code (ITE Code) 945, which applies to a gasoline service station with a
convenience market. The petitioner’s engineer opined that ITE Code 853,
which applies to a convenience market with gasoline pumps, was the correct
code for this development. The petitioner argues that the board’s approval
should be conditioned upon written confirmation from DOT that ITE Code 945
is the correct code. The record shows that DOT advised the intervenor’s
engineer that ITE Code 945 was correct. Both the intervenor’s engineer and
the town’s engineer believed ITE Code 945 to be correct. Based upon this
record, we conclude that there was sufficient evidence for the board to
conclude that ITE Code 945 was correct. Moreover, we agree with the superior
court that there is evidence in the record to support a finding that the
difference between the estimated traffic flows would have an insignificant
impact on the petitioner’s property. See id.

Affirmed.

Dalianis, C.J., and Hicks, Conboy, and Lynn, JJ., concurred.

Eileen Fox,
Clerk

3